New Madrid County, Missouri

SWPPP in Catron, MO

Describe your project in 2 minutes: stormwater consultants who serve Catron get back to you with quotes.

Population
37
County
New Madrid County
Land area
0.4 sq mi
  • Free, no obligation: you decide whether to hire anyone.
  • Up to 3 local pros who serve your area.
  • Your contact details are shared only with your consent.

Your project in Catron

About 2 minutes Free No obligation

Step 1 of 4 What do you need?
Step 2 of 4 Tell us about your project
Project type
Area disturbed
You are
What do you need? (optional)
Step 3 of 4 Where and when?
When would you like to start?
Add details (optional)

Do not enter your contact details here: they are requested in the next step.

Step 4 of 4 How can professionals reach you?

US phone number, mobile or landline.

Your contact details are shared with no more than 3 professional(s), and only with your consent below.

Free for you. You are free to accept or decline the professionals' proposals.

Looking for a SWPPP consultant in Catron, MO? Describe your project once and up to three stormwater consultants who work in Catron and New Madrid County get back to you with a quote. It's free and there is no obligation.

Catron is home to about 37 people (2024 Census Bureau estimate), a shrinking community (−2.6% since 2020). With 100 people per sq mi, it is a rural area. Subdivisions and commercial sites here need stormwater permit coverage before grading.

Catron at a glance

Population (Census Bureau estimate, 2024)
37 (−2.6% since 2020)
Rank in Missouri
902nd of 938 cities and towns
Land area
0.4 sq mi
Population density
100 people per sq mi (rural)
Type
Town (Catron town)
Main county
New Madrid County

What to check before hiring in Catron

  • Permit: in Missouri, check the state construction general permit.
  • Local rules: Catron may add its own erosion control permit.
  • Records: keep inspection reports on site.
  • Price drivers: site size, phases, inspection frequency and duration.

Useful official resources

Services available in Catron

Frequently asked questions in Catron

How much does a SWPPP cost in Catron, MO?

It depends on site size, phases and inspections. Describe your project: consultants who serve Catron reply with a quote.

How long does it take?

Plans often take days to a couple of weeks, plus the permit review.

What happens at the end?

A notice of termination is filed once the site is stabilized.

Which stormwater consultants will contact me?

Up to three independent stormwater consultants who serve Catron and the surrounding area, chosen for the service you need. Your details are shared only with your consent.

Source: U.S. Census Bureau, Population Estimates Program (Vintage 2024) and Gazetteer Files (public domain), imported on 10/31/2026. Figures describe the incorporated place or county as published; they are shown for information only.

A project in Catron?

Describe it in 2 minutes. It's free and there is no obligation: local pros who serve your area get back to you.

Describe my project

Describe my project, it's free